Pakistan Tourism Railway Infrastructure Project

Project Overview

The Changa Manga Forest Park tourist railway project is part of the “Master Planning and Implementation for Eco-Tourism at Changa Manga and Wetlands in Punjab” initiative in Pakistan. Located in Punjab Province, Changa Manga is one of the country’s largest man-made forests and a major eco-tourism destination.

To support the development of the park’s sightseeing railway system, we supplied a complete set of rail track materials for the tourist train line, helping create a safe, stable, and long-lasting transportation system within the forest area.

Project Information

ItemDetails
Project NameChanga Manga Park Train Rail System
LocationPunjab, Pakistan
Design ConsultantShahzad Ayub Associates
Track LengthApprox. 6.115 km
Rail TypeP22 Light Gauge Tourist Railway
Supply ScopeSteel Rails, Turnouts, Fishplates & Fastening Components

。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。

tourism railway infrastructure

Supply Scope

Steel Rails

We manufactured and supplied high-quality steel rails according to the required rail cross-section specifications for the tourist railway system. The rails were designed to provide stable performance, smooth operation, and long service life under outdoor environmental conditions.

Turnouts & Switching Systems

Custom-engineered turnouts (switches and crossings) were supplied for station areas and maintenance access sections. The turnout layout was produced in accordance with the project alignment drawings to ensure accurate installation and reliable railway operation.

Fishplates & Fastening Components

Heavy-duty fishplates and fastening systems were supplied to maintain secure rail connections and overall track stability throughout the railway line.

tourist train rail

Engineering & Project Support

In addition to material supply, our team provided technical coordination support, including engineering drawings and production matching according to the project requirements. All components were manufactured and prepared based on the construction schedule to support efficient on-site installation.

Logistics & Delivery

All rail materials, including steel rails, turnouts, and fishplates, were delivered according to the project timeline in December 2025. Each shipment was clearly labeled by product category, quantity, and project reference to facilitate site management and installation coordination.

railway project case study

Project Outcome

The Changa Manga tourist railway project was successfully completed with the support of our integrated rail material supply solution. The project demonstrates our capability in supplying railway products for tourism rail systems, park railways, and narrow-gauge infrastructure projects worldwide.

Our client team recognized the precision, product quality, and on-time delivery performance throughout the project implementation process.

park railway system

。。。。。。。。。。。。。。。。。。。。。。。。

Looking for Railway Material Supply for Tourism or Industrial Projects?

We provide:

  • Steel Rails
  • Crane Rails
  • Light & Heavy Rail Systems
  • Turnouts & Rail Fasteners
  • Rail Processing & Custom Fabrication
  • Technical Drawing Support

For project inquiries, contact us for customized rail solutions.