Project Description

crane rail grout

Crane Rail Grout

Type: hook bolts
Material:q235
Dimensions (L x W x H) (mm):Custumers’ Requirements
Place of Origin:Henan, China
Brand Name:Glory Rail
HS Code:730240
Usage: Gantry Crane
Quality Control: Production Process
Keyword: Rail clips
Color: Clients’demend
Sample: Available upon request
doc:PI, CI, CO, FORME
Advantage:Large Stock

For product pricing, customization, or other inquiries:

Get A Quote

GloryRail crane rail grout

Crane rail grout is a kind of natural aggregate containing selected natural aggregates. It has excellent fluidity, high compressive strength, long working time, economy, compactness, no shrinkage, no rust, no metal aggregate, convenient and continuous construction Special track mortar with reinforcement, good bonding performance, and toughness.

Glory Rail could supply quality crane rail grout for the rail installation system. Our engineer will give a suggestion that the application amount of cement, our products had been used for instead of FIVESTAR products in some projects. the quality has been proved to be feasible through practice,

1. Scope of application
Grouting for port and wharf crane track troughs. (Used for grouting of track pressure plate, bottom plate bolt fixing, etc.)
Various mechanical equipment installation, steel structure supporting body foundation, anchor bolt hole grouting, etc.

crane rail grout supplier

crane rail grout supplier

2. Product performance
For detailed application technology of the product, please refer to GB50448-2008 “Technical Specification for Application of Cement-based Grouting Materials” in Technical Support

The above data is measured under standard laboratory conditions;

Three, the construction method
1. Preparation before construction:
(1) Clean the track foundation surface. 24 hours before grouting, the track foundation surface should be fully moistened. One hour before grouting, the accumulated water should be absorbed.
(2) Support the formwork according to the grouting construction drawing, and the formwork shall not leak.
(3) If the grouting phenomenon occurs during grouting, it should be dealt with in time.

2. The process of grouting for track mortar materials should meet the following requirements:

(1) When the track mortar is grouted for the second time, it shall be grouted from one side until the other side overflows, and shall not be grouted from all four sides at the same time.
(2) After the grouting starts, it must be carried out continuously without interruption, and the grouting time should be shortened as much as possible.
(3) Vibration is strictly prohibited during the grouting process. When necessary, bamboo slats can be used for diversion.
(4) The grouting thickness should not exceed 150mm each time. When the grouting layer is less than 30mm, corresponding auxiliary measures should be taken or other types of materials should be used.
(5) The vibration of the running machine must not be transmitted to the foundation of the equipment to be grouted.

3. The initial setting time of  Glory Rail crane rail grout grouting is about 3~4 hours.

4. After 3~4 hours, use visual inspection and hand feeling to debate whether the initial setting, 152, 0161, 8421 technical guidance parameters. After confirming that it has solidified for the first time, lightly smooth the surface with a batch knife, and then cover the surface with burlap or cotton cloth.

5. According to the difference in temperature every day, under 15℃, use water for maintenance once in the morning and evening; 15℃-35℃ for maintenance with water once in the morning, at night, and every day.

6. Wet and maintain the solidified track cement for no less than 7 days.

If you are interested in this products, pls feel free to contact us, we will give you the quote  in the shortest possible time!

          Contact Us

E-mail: info@glorysteelwork.com

Whatsapp:86 15036167067

Mobile: 86 15036167067

Skype: karenwu7067